Friday, 19 October 2012
New installations brands Rolex "Full Control"
In Bienne, Switzerland, Rolex finally built a new production building, after a decade-long project.
Manufacturers have been completed, and now occupies an area equivalent to 13 football fields, with a high-tech automated stock and recovery system components using the robot to pick things off the shelves.
Replica Rolex, watch it now has "full control", which case, movement, dial and bracelet in an important part of the manufacturing industry.The new building has been invited to the presence of four cross-Rolex Website Bill and Geneva is a "visionary strategic decision to integrate the various stages of manufacture watches produced by Rolex.
Previous move, made in the Charter, Rolex R & D, design, communication, sales and after-sales service, based in Geneva.
The activities of the final assembly of watch components, development and manufacture of the case and bracelet and dial-up and jewelry and gems creating web pages in Geneva.
The brand is now in seven buildings on the outskirts of the Champs Elysees (Champs-DE) District Bill Boujean, separate from each other in the manufacture of new land in 2006, Bill of town.
It is said that pool of your business is the development and optimization of force production.
Rolex grouping of two existing units, a volume of 170 square meters, with 230,000 square meters, the construction of a new one. This has resulted in the production facility of 400,000 square meters, equivalent to 13 football fields. Great space meets Rolex machining, stamping, thermal stability and surface treatment, maintenance and laboratory activities, and the need to manufacture its sports assembly operations.
The new building has four floors, three on the ground floor below the house, an impressive storage, fully automatic and retrieval system, in order to ensure timely delivery and finishing plant components.
The new automated system will save time, changes in the production process, but also provides better inventory management. It also said that "unprecedented" part of their safety and injury prevention.
Automated storage shelf 14 of the aisle, wherein the components that can store millions of dollars. Each channel service robot picked up the conveyor belt 14 tray requires shelves automatic transport areas different distribution of work.
The system is also fully computerized, coordination of action 60 programmable controller tray is running, the routing system between management and actions boot disk and workshop. The entire device is considered to be "continuous monitoring, 24 hours a day, and a program of high-performance software.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment